+ | On September 30, 2008, 3000 units were made available for pre-order. Later on, this number was increased to 4000. The release of the Pandora was delayed several times until May 2010, when mass production and shipping of the Pandora began. A [[Production Timeline]] page describes the process. | ||
+ | |||
+ | For the first batch, 4000 units were made available to be pre-ordered for $330 USD each. Currently units from this batch these are being assembled and shipped out to customers. A second batch of 4000 was made available for pre-order in July 2010. The price of the second batch was $349 USD. [http://www.gp32x.com/board/index.php?/topic/54958-just-had-my-2nd-batch-pre-order-email/] | ||
+ | |||
+ | During fulfillment of the first batch, a limited but unspecified number of "Instant" Pandoras were made available at $500 and promised to be shipped in 7 days [http://boards.openpandora.org/index.php?/topic/1294-instant-pandoras-the-summary-read-first/]. This has since become the only way of purchasing a Pandora, though the the 7-day Guarantee had applied. Instant was officially closed in August of 2011 as it was apparent Circuitco was not producing anymore boards. | ||
+ | |||
+ | EvilDragon announced in the same month that a new pre-order system has been setup while all resources are being transfer to Germany for production there. [http://boards.openpandora.org/index.php?/topic/5577-preorders-have-started-2011-10-04/] The newer Pandoras will feature a greater RAM size and a more sturdy case. | ||
+ | |||
+ | [As of 2012-06-19 this information is badly out of date. It's shipping is now fairly consistent.] | ||
+ | |||
+ | {{FIXME|Ancient!}} | ||
+ | |||
+ | |||
+ | * Note: With the new production line in Germany, 256MB RAM modules have become unavailable in the recent time frame. All new Pandoras being/have been produced contain now contain a 512MB RAM module. | ||
+ | |||
+ | * 256MB (Ciruitco model) or 512MB (Germany Model) DDR SDRAM in consumer units (early developer units had 128MB). | ||
+ | |||
+ | A detailed economic history of the project from August 2011 until December 2012 is contained in [http://boards.openpandora.org/index.php?/topic/10774-a-further-update-on-preorders-18th-of-november-2012/page__st__280#entry204794 this post] by Michael Mrozek (EvilDragon). | ||
+ | |||
+ | * [http://www.gp32x.com/board/index.php?showtopic=43063 The Official Development Update List] - When one of the Pandora team members posts an update about the hardware, software, or manufacturing process, it is added to this list (note: last updated in Feb. 2009. Useful for historical reasons) | ||
[[Category:Documentation]] | [[Category:Documentation]] |
Revision as of 12:52, 18 October 2013
The Pandora Production Timeline
2008+
Date | Note |
---|---|
(yyyy/mm/dd) | Milestone with short description and link to reference if possible. |
2008/09/30 | 3000 units were made available for pre-order, resulting in server overload and crashes. |
2008/09/ | Within first few days pre-order extended to 4000 units.
|
2008/10/ | Craig's bank account frozen. Later on, refunds start to be sent out [1] |
2008/10/30 | Amount of ram increased to 256MB (from 128MB), NAND increased to 512MB (from 256MB). [2] |
2009/01 | Re-paying for pre-orders begins [3] |
2009 | Renders of the case shown off [4] |
2009 | Pre-ordering re-opened to fill places freed up after the great banking event. Only cash/bank transfer payments were accepted, no credit payments. |
2009 | Prototype caseworks received. |
2009 | Populated PCBs shown off. |
2010+
Date | Note |
---|---|
(yyyy/mm/dd) | Milestone with short description and link to reference if possible. |
2010/05/21 | First shipments start[5].
|
2010/06/01 | 2nd Batch Pre-order emails start to be sent out.
|
2010/07 | Production is stalled to help prevent building more units with faulty nubs.
|
2010/08/04 | Another 100 from the first batch start to ship[9]
|
2010/08/13 | Another 200 are in the process of being built[10][11] |
2010/09/20 | 100 scheduled to ship[12], taking production past the 1000 mark.
|
2010/10/06 | 2000 cases arrive in the UK[13].
|
2011/01/05 | First Pandora from a batch of 350 boards that shipped over Christmas has been delivered[14]
|
2011/01/07 | 400-550 units shipped to customers this week.[15]
|
2011/01/27 | Craig announces that premium Pandoras can be ordered for delivery within 7 days at a price of $500[17]
|
2011/07/19 | Last known arrival of a circuit co Pandora in germany.[18] |
2011/08/26 | Pandora production is in the process of being moved to Germany. 1200 preorders remain to be shipped (800 from Craig's queue, 500 from EvilDragon's).[19] |
2011/ | placeholder - anything to mention? please contribute |
2012+
Date | Note |
---|---|
(yyyy/mm/dd) | Milestone with short description and link to reference if possible. |
2012/02/28 | First Pandora scam site found.[20] |
2012/03/ | (?01-04?) Rebirth! |
2012/03/06 | First rebirth Pandora in germany posted for arrival at its owner[21] |
2012/03/29 | 2nd day preorders completely sent to EDs customers? First 3rd day (2008/10/02) preorder received pandora.[22] |
2012/05/07 | First 6th day (2008/10/05) preorder received pandora.[23] |
2012/06/12 | First 2009 order seen received.[24] |
2012/08/24 | Approx. 75 remaining preorders in EDs batch 1 queue.[25] |
2012/12/10 | Approx. 34 remaining preorders in EDs batch 1 queue. 116 preorders (150-34) in batch 2 queue.[26] |
2013/01/12 | ED announced all batch 1 preorders of the gp2x.de shop are ready for delivery.
|
2013/05/11 | ED revealed survey results about the remaining pre-orders of Craig. [28]
|
Pandora > History
On September 30, 2008, 3000 units were made available for pre-order. Later on, this number was increased to 4000. The release of the Pandora was delayed several times until May 2010, when mass production and shipping of the Pandora began. A Production Timeline page describes the process.
For the first batch, 4000 units were made available to be pre-ordered for $330 USD each. Currently units from this batch these are being assembled and shipped out to customers. A second batch of 4000 was made available for pre-order in July 2010. The price of the second batch was $349 USD. [30]
During fulfillment of the first batch, a limited but unspecified number of "Instant" Pandoras were made available at $500 and promised to be shipped in 7 days [31]. This has since become the only way of purchasing a Pandora, though the the 7-day Guarantee had applied. Instant was officially closed in August of 2011 as it was apparent Circuitco was not producing anymore boards.
EvilDragon announced in the same month that a new pre-order system has been setup while all resources are being transfer to Germany for production there. [32] The newer Pandoras will feature a greater RAM size and a more sturdy case.
[As of 2012-06-19 this information is badly out of date. It's shipping is now fairly consistent.]
- Note: With the new production line in Germany, 256MB RAM modules have become unavailable in the recent time frame. All new Pandoras being/have been produced contain now contain a 512MB RAM module.
- 256MB (Ciruitco model) or 512MB (Germany Model) DDR SDRAM in consumer units (early developer units had 128MB).
A detailed economic history of the project from August 2011 until December 2012 is contained in this post by Michael Mrozek (EvilDragon).
- The Official Development Update List - When one of the Pandora team members posts an update about the hardware, software, or manufacturing process, it is added to this list (note: last updated in Feb. 2009. Useful for historical reasons)